When a neighbour's windows sit close to your exit staircase, the SCDF Fire Code can require a 1.5-hour fire-rated wall. What SCDF decided in one case, and the options.
If a neighbouring unit's windows or doors sit within 1.5 m of your internal exit staircase, the SCDF Fire Code can require you to protect the staircase with 1.5-hour fire-rated construction. That can close off part of an open shopfront, so check it before the design is fixed.
An open, welcoming shopfront is great for business. This case study, part of our SCDF Fire Code Explained series, looks at how Clause 2.3.3a.(3) of the SCDF Fire Code 2023 was applied to a terrace unit in Singapore, and what the owner's options were. Names and address are changed.
The project
Ms Lim was converting a terrace unit at 18 Pelangi Walk into Saffron Lane Bakery. Her design kept the frontage open to draw in walk-in customers.
The unit's internal exit staircase ran along the front, right next to the neighbouring unit's staircase. That neighbour had unprotected openings, such as ordinary windows and doors, along the same frontage.
The Fire Code rule
Clause 2.3.3a.(3) of the Fire Code's means of escape requirements protects internal exit staircases from fire spreading in from outside. It requires that there be no unprotected openings of an occupancy area, and no combustible material or construction, within:
- 1.5 m horizontally of any opening in the staircase's external wall, or
- 3 m vertically below such an opening
The aim is simple: if a fire breaks out next door, smoke and flames shouldn't reach the staircase people are using to escape.
What SCDF said
Redguard sought a formal clarification from SCDF on whether the clause applied. SCDF confirmed it did. Because of how close the neighbour's staircase and openings were, a 1.5-hour fire-rated construction or separation had to be provided to protect Ms Lim's exit staircase.
SCDF was clear that this fire-rated construction is a Code requirement, not a suggestion.
The way forward: two options
| Option | What it involves | Trade-off |
|---|---|---|
| 1. Comply with the Code as written | Build 1.5-hour fire-rated construction to separate the staircase | Straightforward approval path, but closes off part of the open frontage |
| 2. Propose an alternative | The Qualified Person (QP) submits a detailed alternative arrangement with drawings, justifications and supporting calculations | Can keep more of the frontage open, but needs SCDF's formal acceptance and more design work |
SCDF left the door open for option 2, provided the alternative achieves an equivalent level of fire safety. That is common: the Fire Code sets a standard, and a well-justified engineering alternative can sometimes meet it differently.
Why this matters for your project
This issue surfaced during design, which was the right time. Had the frontage been built first, the fix would have meant tearing out finished work, re-submitting plans and delaying the Fire Safety Certificate (FSC). That's why we advise against renovating before SCDF approval.
Three lessons for owners of shophouses, terrace units and small commercial premises:
- Check your neighbours, not just your own unit. Clause 2.3.3a.(3) is triggered by openings near your staircase, even ones on the property next door. Our shophouse rental checklist covers this before you sign a lease.
- Ask SCDF early when a clause is unclear. A formal clarification before submission costs far less than a rejected plan. See how long an FSC application takes.
- Weigh the alternative-solution route carefully. It can protect your design intent, but needs strong drawings and calculations from an experienced QP.
If you're changing what the unit is used for, read our guide to change of use approvals too.
How to check your own unit
Before you fix the shopfront design, walk the outside of your exit staircase with your QP and look at:
- Beside the staircase: any window, door, vent or open frontage within 1.5 m sideways of an opening in the staircase's external wall, on your side or the neighbour's
- Below the staircase openings: anything unprotected, or any combustible material such as a canopy or signage, within 3 m below
- Your own plans: whether the new shopfront, counter or signage adds an opening or combustible finish inside that zone
- The neighbour's plans: whether their unit is also being renovated, since a new opening next door can change the picture
If anything falls inside the zone, raise it with your QP before the design is fixed. Not sure whether your works need SCDF approval at all? See whether your premises need an FSC.
How Redguard helps
Redguard is a PE-led fire safety consultancy with 30+ years combined experience. We review layouts against the Fire Code before you build, raise formal clarifications with SCDF when a clause is unclear, prepare alternative proposals where the design calls for one, and handle the SCDF submission and FSC. A Pre-FSC compliance check is a site survey plus written report for S$250, issued within 3 to 5 working days after the survey, and credited if you engage us for the submission.
WhatsApp us on 8332 1068. We reply the same day.
Disclaimer: This article serves as a case study for discussion only and is not professional advice. Requirements depend on each premises, so please engage a Qualified Person (QP) for advice. REDGUARD accepts no liability for reliance on this article.
Sources: SCDF Fire Code 2023 – Clause 2.3 means of escape requirements · SCDF – plans and consultations · SCDF – change of use
FAQ
What is an unprotected opening?
An opening, such as an ordinary window, door or vent, that isn't fire-rated, so fire and smoke can pass through it.
Does Clause 2.3.3a.(3) apply to my neighbour's openings too?
It can. In this case SCDF applied it because the neighbouring unit's staircase and openings were within the protected zone around the exit staircase.
Can I avoid building the fire-rated wall?
Only if your QP submits an alternative proposal that achieves an equivalent level of fire safety and SCDF formally accepts it.
How do I ask SCDF for a clarification?
Your QP can ask SCDF through its fire safety consultations for QPs and owners, by phone, email or online.
Need this for your premises?
Our team can help with Fire Safety Certificate (FSC) & SCDF Submission.